Skip to main content

András Kovács, Ph.D.

senior research fellow
Email
@email
Phone
+36 1 279 6189
Address
1111 Budapest, Kende u. 13-17.
Room number
K 416

Research interests

Modeling and solving optimization problems in manufacturing. Combinatorial optimization, mathematical programming, constraint programming, bilevel programming.

Degrees

  • PhD in Technical Sciences, Budapest University of Technology and Economics, 2006
  • MSc in Technical Informatics, Budapest University of Technology and Economics (thesis written at EPFL, Lausanne), 2001

Awards

  • Bolyai Research Fellowship of the Hungarian Academy of Sciences (twice, 2007-2010 and 2017-2020)
  • Outstanding paper award, IEEE GPECOM (2019)
  • SZTAKI Award for outstanding publication (twice, 2017 and 2012)
  • SZTAKI Award for outstanding research (6 times, 2021, 2016, 2013, 2009, 2006, and 2005)
  • ERCIM "Alain Bensoussan" Fellowship (at 4C, Ireland and at INRIA, France, 2006-2007)

Publications

International journals

  • Cserteg, T.; Kovács, A.; Váncza, J.: Multi-operation optimal blank localization for near net shape machining. CIRP Annals – Manufacturing Technology, 72(1):433-436, 2023. [pdf] [doi]
  • Tsutsumi, D.; Bergmann, J.; Dobrovoczki, P.; Hayashi, N.; Kovács, A.; Szádoczki, Zs.; Szaller, Á.; Umeda, S.: Dynamic production line re-balancing by alternative plans for compensating equipment failures. Procedia CIRP, 120:810-815, 2023. [pdf] [doi]
  • Cserteg, T.; Kovács, A.; Váncza, J.: Multi-operation blank localization with hybrid point cloud and feature-based representation. Procedia CIRP, 120:756-761, 2023. [pdf] [doi]
  • Cserteg, T.; Erdős, G.; Horváth, G.; Kovács, A.: Digital twin assisted workpiece referencing for compensating the stock deviation of casted parts. Procedia CIRP, 118:288-293, 2023. [pdf] [doi]
  • Zahorán, L.; Kovács, A.: ProSeqqo: A generic solver for process planning and sequencing in industrial robotics. Robotics and Computer-Integrated Manufacturing, 78:102387, 2022. [pdf] [doi]
  • Tsutsumi, D.; Kovács, A.; Szalóki, Á.: Novel heuristic approach to integrating task sequencing and production system configuration. Procedia CIRP, 107:28-33, 2022. [pdf] [doi]
  • Horváth, M.; Kis, T.; Kovács, A.; Fekula, M.: Assembly planning by disjunctive programming and geometrical reasoning. Computers and Operations Research, 138:105603, 2022. [pdf] [supplementary] [doi]
  • Tipary, B.; Kovács, A; Erdős, G.: Planning and optimization of robotic pick-and-place operations in highly constrained industrial environments. Assembly Automation, 41(5):626-639, 2021. [pdf] [doi]
  • Kovács, A.: Inverse optimization approach to the identification of electricity consumer models. Central European Journal of Operations Research, 29(2):521-537, 2021. [pdf] [doi]
  • Kis, T.; Kovács, A.; Mészáros, Cs.: On optimistic and pessimistic cases of bilevel electricity tariff optimization. Energies, 14(8):2095, 2021. [pdf] [doi]
  • Tsutsumi, D.; Gyulai, D.; Kovács, A.; Tipary, B.; Ueno, Y.; Nonaka, Y.; Fujita, K.: Joint optimization of product tolerance design, process plan, and production plan in high-precision multi-product assembly. Journal of Manufacturing Systems, 54:336-347, 2020. [pdf] [doi]
  • Kardos, Cs.; Kovács, A.; Váncza, J.: A constraint model for assembly planning. Journal of Manufacturing Systems, 54:196-203, 2020. [pdf] [doi]
  • Kovács, A.: Bilevel programming approach to demand response management with day-ahead tariff. Journal of Modern Power System and Clean Energy, 7(6): 1632-1643, 2019. [pdf] [doi]
  • Kovács, A.: On the computational complexity of tariff optimization for demand response management. IEEE Transactions on Power Systems, 33(3):3204-3206, 2018. [pdf] [doi]
  • Tsutsumi, D.; Gyulai, D.; Kovács, A.; Tipary, B.; Ueno, Y.; Nonaka, Y.; Monostori, L.: Towards joint optimization of product design, process planning and production planning in multi-product assembly. CIRP Annals – Manufacturing Technology, 67(1):441-446, 2018. [pdf] [doi]
  • Kardos, Cs.; Kemény, Zs.; Kovács, A.; Pataki, B.E.; Váncza, J.: Context-dependent multimodal communication in human–robot collaboration. Procedia CIRP, 72:15-20, 2018. [pdf] [doi]
  • Horváth, G.; Kardos, Cs.; Kemény, Zs.; Kovács, A.; Pataki, B.E.; Váncza, J.: Multi-modal interfaces for human–robot communication in collaborative assembly. ERCIM News 114:15-16, 2018. [pdf] [link]
  • Kardos, Cs.; Kovács, A.; Váncza, J.: Decomposition approach to optimal feature-based assembly planning. CIRP Annals – Manufacturing Technology, 66(1):417-420, 2017. [pdf] [doi]
  • Kovács, A.; Bátai, R.; Csáji, B.Cs.; Dudás, P.; Háy, B.; Pedone, G.; Révész, T.; Váncza, J.: Intelligent control for energy-positive street lighting. Energy, 114:40-51, 2016. [pdf] [doi]
  • Kovács, A.: Integrated task sequencing and path planning for robotic remote laser welding. International Journal of Production Research, 54(4):1210-1224, 2016. [pdf] [doi]
  • Erdős, G.; Kovács, A.; Váncza, J.: Optimized joint motion planning for redundant industrial robots. CIRP Annals – Manufacturing Technology, 65(1):451-454, 2016. [pdf] [doi]
  • Erdős, G.; Kardos, Cs.; Kemény, Zs.; Kovács, A.; Váncza, J.: Process planning and offline programming for robotic remote laser welding systems. International Journal of Computer Integrated Manufacturing, 29(12):1287-1306, 2016. [pdf] [doi]
  • Csáji, B.Cs.; Kovács, A.; Váncza, J.: Online Learning for Aggregating Forecasts in Renewable Energy Systems. ERCIM News, 107:40-41, 2016. [pdf] [link]
  • Kardos, Cs.; Kovács, A.; Váncza, J.: Towards feature-based human-robot assembly process planning. Procedia CIRP, 57:516-521, 2016. [pdf] [doi]
  • Gyulai, D.; Kádár, B.; Kovács, A.; Monostori, L.: Capacity management for assembly systems with dedicated and reconfigurable resources. CIRP Annals – Manufacturing Technology, 63(1): 457-460, 2014. [pdf] [doi]
  • Erdős, G.; Kardos, Cs.; Kemény, Zs.; Kovács, A.; Váncza, J.: Workstation configuration and process planning for RLW operations. Procedia CIRP, 17:783-788, 2014. [pdf] [doi]
  • Csáji, B.Cs.; Háy, B.; Kovács, A.; Pedone, G.; Révész, T.; Váncza, J.: E+grid: Monitoring and controlling energy-positive public lighting. ERCIM News, 98:36-37, 2014. [pdf] [link]
  • Egri, P.; Kis, T.; Kovács, A.; Váncza, J.: An Inverse Economic Lot-sizing Approach to Eliciting Supplier Cost Parameters. International Journal of Production Economics, 149:80-88, 2014. [pdf] [doi]
  • Nonaka, Y.; Erdős, G.; Kis, T.; Kovács, A.; Monostori, L.; Nakano, T.; Váncza, J.: Generating alternative process plans for complex parts. CIRP Annals – Manufacturing Technology, 62(1):453-458, 2013. [pdf] [doi]
  • Erdős, G.; Kemény, Zs.; Kovács, A; Váncza, J.: Planning of remote laser welding processes. Procedia CIRP, 7:222-227, 2013.[pdf] [doi]
  • Kovács, A.; Egri, P.; Kis, T.;Váncza, J.: Inventory control in supply chains: alternative approaches to a two-stage lot-sizing problem. International Journal of Production Economics, 143(2):385-394, 2013. [pdf] [doi]
  • Kis, T.; Kovács, A.: Exact solution approaches for bilevel lot-sizing. European Journal of Operational Research, 226(2):237-245, 2013. [pdf] [doi]
  • Kis, T.; Kovács, A.: On bilevel machine scheduling problems. OR Spectrum, 34(1):43-68, 2012. [pdf] [doi]
  • Kis, T.; Kovács, A.: A cutting plane approach for integrated planning and scheduling. Computers and Operations Research, 39(2):320-327, 2012. [pdf] [doi]
  • Kovács, A.: Optimizing the Storage Assignment in a Warehouse Served by Milkrun Logistics. International Journal of Production Economics, 133(1):312-318, 2011. [pdf] [doi]
  • Kovács, A.; Erdős, G.; Viharos, Zs.J.; Monostori, L.: A System for the Detailed Scheduling of Wind Farm Maintenance. CIRP Annals – Manufacturing Technology, 60(1):497-501, 2011. [pdf] [doi]
  • Kovács, A.; Kis, T.: Constraint Programming Approach to a Bilevel Scheduling Problem. Constraints, 16(3):317-340, 2011. [pdf] [doi]
  • Kovács, A.; Beck, J.C.: A Global Constraint for Total Weighted Completion Time for Unary Resources. Constraints, 16(1):100-123, 2011. [pdf] [doi]
  • Monostori, L.; Erdős, G.; Kádár, B.; Kis, T.; Kovács, A.; Pfeiffer, A.; Váncza, J.: Digital Enterprise Solution for Integrated Production Planning and Control. Computers in Industry, 61(2):112-126, 2010. [pdf] [doi]
  • Kovács, A.; Brown, K.N.; Tarim, S.A.: An Efficient MIP Model for the Capacitated Lot-sizing and Scheduling Problem with Sequence-dependent Setups. International Journal of Production Economics 118(1):282-291, 2009. [pdf] [doi]
  • Kovács, A.; Beck, J.C.: A Global Constraint for Total Weighted Completion Time for Cumulative Resources. Engineering Applications of Artificial Intelligence, 21(5):691-697, 2008. [pdf] [doi]
  • Monostori, L.; Váncza, J.; Márkus, A.; Kis, T.; Kovács, A.; Erdős, G.; Kádár, B.; Viharos, Zs.J.: Real-time, Cooperative Enterprises: Management of Changes and Disturbances in Different Levels of Production. CIRP - Journal of Manufacturing Systems 35(4):351-359, 2006. [pdf]
  • Kovács, A.; Márkus, A.; Váncza, J.: Structural Exploration of Constraint-based Scheduling Problems. CIRP - Journal of Manufacturing Systems 34(4):291-298, 2005. [pdf]
  • Váncza, J.; Kis, T.; Kovács, A.: Aggregation – The Key to Integrating Production Planning and Scheduling. CIRP Annals – Manufacturing Technology 53(1):377-380, 2004. [pdf] [doi]
  • Kovács, A.; Kis, T.: Partitioning of Trees for Minimizing Height and Cardinality. Information Processing Letters 89(4):181-185, 2004. [pdf] [doi]
  • Márkus, A.; Váncza, J.; Kis, T.; Kovács, A.: Project Scheduling Approach to Production Planning. CIRP Annals – Manufacturing Technology 52(1):359-362, 2003. [pdf] [doi]
  • Márkus, A.; Váncza, J.; Kovács, A.: Constraint-based Process Planning in Sheet Metal Bending. CIRP Annals – Manufacturing Technology 51(1):425-428, 2002. [pdf] [doi]

International conferences and workshops

  • Kis, T.; Kovács, A.; Mészáros, Cs.: Robust bilevel approach to energy management in smart grids. International Conference on Bilevel Optimization (ICBO-23), Southampton, UK, pp. 28, 2023. [pdf] [link]
  • Zahorán, L.; Kovács, A.: ProSeqqo: Open-source solver for robotic task sequencing. 32nd International Conference on Automated Planning and Scheduling (ICAPS 2022), System Demonstrations, 2022. [pdf] [link] [video]
  • Csáji, B. Cs.; Kis, K. B.; Kovács, A.: A sampling-and-discarding approach to stochastic model predictive control for renewable energy systems. 21st IFAC World Congress (IFAC 2020), IFAC PapersOnLine 53(2):7142-7147, 2020. [pdf] [doi]
  • Németh, B.; Kovács, A.: Robot path planning over a sequence of points specified in task space. ICAPS Workshop on Planning and Robotics (PlanRob2020), Nancy, France, 2020. [pdf] [link]
  • Kovács, A.: Parameter elicitation for consumer models in demand response management. Proc. of the IEEE Global Power, Energy and Communication Conference (GPECOM 2019), pp. 456-460, 2019. [pdf] [doi]
  • Kardos, Cs.; Kovács, A.; Pataki, B.E.; Váncza, J.: Generating human work instructions from assembly plans. Proc. of the 2nd ICAPS Workshop on User Interfaces and Scheduling and Planning (UISP2018), Delft, The Netherlands, pp. 31-39, 2018. [pdf] [link]
  • Kovács, A.: Bilevel Programming Approach to Optimizing a Time-variant Electricity Tariff for Demand Response. IEEE SmartGridComm'2016, 7th IEEE International Conference on Smart Grid Communications, pp. 674-679, 2016. [pdf] [doi]
  • Erdős, G.; Kardos, Cs.; Kemény, Zs.; Kovács, A.; Váncza, J.: Planning and off-line robot programming system for remote laser welding. 25th International Conference on Automated Planning and Scheduling (ICAPS 2015), System Demonstrations, Jerusalem, 2015. [pdf]
  • Csáji, B.Cs.; Kovács, A.; Váncza, J.: Adaptive aggregated predictions for renewable energy systems. Proceedings of the 2014 IEEE Symposium on Adaptive Dynamic Programming and Reinforcement Learning (ADPRL), Orlando, USA, pp. 132-139, 2014. [pdf] [doi]
  • Csáji, B.Cs.; Kovács, A.; Váncza, J.: Prediction and robust control of energy flow in renewable energy systems. Proceedings of the 19th IFAC World Congress, Cape Town, South Africa, pp. 3663-3669, 2014. [pdf] [doi]
  • Kovács, A.: Collision-free path planning for remote laser welding. In: Proc. of the 2nd ICAPS Workshop on Planning and Robotics (PlanRob2014), Portsmouth, NH, USA, pp. 172-181, 2014. [pdf] [link]
  • Kovács, A.: Task Sequencing for Remote Laser Welding in the Automotive Industry. In: Proc. of the 23rd International Conference on Automated Planning and Scheduling (ICAPS 2013), Rome, pp. 457-461, 2013. [pdf]
  • Egri, P.; Kis, T.; Kovács, A.;Váncza, J.: An Inverse Economic Lot-sizing Approach to Eliciting Supplier Cost Parameters. In: Preprints of the 17th International Working Seminar on Production Economics, Innsbruck, Vol. 2, pp. 197-207, 2012. [pdf]
  • Kovács, A.; Erdős, G.; Monostori, L.; Viharos, Zs.J.: Scheduling the maintenance of wind farms for minimizing production loss. In: Proceedings of the 18th IFAC World Congress, Milano, pp. 14802-14807, 2011. [pdf]
  • Kovács, A.; Csempesz, J.; Erdős, G.; Karnok, D.; Kemény, L.; Monostori, L.; Viharos, Zs.J.: WindMT: An integrated system for failure detection and maintenance scheduling at wind farms. In: ICAPS 2011, the 21st International Conference on Automated Planning and Scheduling, Proceedings of System Demonstrations, Freiburg, pp. 46-49, 2011. [pdf]
  • Kovács, A.; Egri, P.; Kis, T.;Váncza, J.: Approaches to inventory management in supply chains: a comparative study. In: Book of Abstracts, 16th International Symposium on Inventories, Budapest, pp. 107, 2010. [pdf-long] [pdf-short]
  • Kovács, A.; Váncza, J.: Exploiting Repetitive Patterns in Practical Scheduling Problems. 43rd CIRP International Conference on Manufacturing Systems, pp. 868-875, 2010. [pdf]
  • Viharos, Zs.J.; Monostori, L.; Erdős, G.; Kovács, A.: AI Supported Maintenance and Reliability System in Wind Energy Production. In: Proceedings of the European Wind Energy Conference and Exhibition 2010 (EWEC 2010), Warsaw, Poland, Vol. 5, pp. 4010-4022, 2010.
  • Kovács, A.; Kis, T.: Constraint Programming Approach to a Bilevel Scheduling Problem. Coplas`09, ICAPS 2009 Workshop on Constraint Satisfaction Techniques for Planning and Scheduling Problems, 2009. [pdf]
  • Monostori, L.; Viharos, Zs.J.; Erdős, G.; Kovács, A.: AI Supported Maintenance and Reliability System in Wind Energy Production. AI-METH'2009, Symposium on Methods of Artificial Intelligence, Gliwice, Poland, paper nr. 20, 2009.
  • Kis, T.; Kovács, A.: On Bilevel Machine Scheduling Problems. In Proc. of MAPSP’09, Workshop on Models and Algorithms for Planning and Scheduling Problems, pp. 116-118, 2009. [pdf]
  • Kovács, A.: Optimizing the Storage Assignment in a Warehouse Served by Milkrun Logistics. In: Book of Abstracts, 15th International Symposium on Inventories, Budapest, pp. 112, 2008. [pdf-long] [pdf-short]
  • Kovács, A.; Beck, J.C.: Single-machine Scheduling with Tool Changes: A Constraint-based Approach. In: PlanSIG 2007, Proceedings of the 26th Workshop of the UK Planning and Scheduling Special Interest Group, Prague, pp. 71-78, 2007. [pdf]
  • Kovács, A.; Beck, J.C.: Constraint-based scheduling with total completion time criterion: models and applications. In: Preprints of MIM'07, IFAC Workshop on Manufacturing Modelling, Management and Control, Budapest, pp. 139-144, 2007. [pdf]
  • Kovács, A.; Beck, J.C.: Extensions of the COMPLETION Constraint. Coplas`07, CP/ICAPS 2007 Joint Workshop on Constraint Satisfaction Techniques for Planning and Scheduling Problems, Providence, 2007. [pdf]
  • Kovács, A.; Beck, J.C.: A Global Constraint for Total Weighted Completion Time. In: Proc. of CPAIOR 2007, the 4th Int. Conf. on Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems (Springer LNCS 4510), Brussels, pp. 112-126, 2007. [pdf] [doi]
  • Kovács, A.; Brown, K.N.; Tarim, S.A.: An Efficient MIP Formulation for the Capacitated Lot-sizing and Scheduling Problem with Sequence-dependent Setups. In: Book of Abstracts, 14th International Symposium on Inventories, Budapest, pp. 77, 2006.
  • Kovács, A.; Váncza, J.: Progressive Solutions: A Simple but Efficient Dominance Rule for Practical RCPSP. In: Proc. of CPAIOR 2006, the 3rd Int. Conf. on Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems (Springer LNCS 3990), Cork, pp. 139-151, 2006. [pdf] [doi]
  • Kis, T.; Drótos, M.; Erdős, G.; Kovács, A.: The Interval Flow Shop Model. PMS 2006, 10th International Workshop on Project Management and Scheduling, Poznan, 2006.
  • Kovács, A.; Egri, P.; Kis, T.;Váncza, J.: Proterv II: An Integrated Production Planning and Scheduling System. In: Proc. of the 11th International Conference on Principles and Practice of Constraint Programming (Springer LNCS 3709), Sitges, p. 880, 2005. [pdf] [doi]
  • Monostori, L.; Váncza, J.; Márkus, A.; Kis, T.; Kovács, A.; Erdős, G.; Kádár, B.; Viharos, Zs.J.: Real-time, Cooperative Enterprises: Management of Changes and Disturbances in Different Levels of Production. 38th CIRP International Seminar on Manufacturing Systems, Florianopolis, 2005.
  • Kovács, A.; Váncza, J.: Completable Partial Solutions in Constraint Programming and Constraint-based Scheduling. In: Proc. of the 10th International Conference on Principles and Practice of Constraint Programming (Springer LNCS 3258), Toronto, pp. 332-346, 2004. [pdf] [doi]
  • Kovács, A.; Váncza, J.: Completable Partial Solutions in Constraint Programming and Constraint-based Scheduling. In: Proceedings of the CSCLP04 – Joint Annual Workshop of ERCIM / CoLogNet on Constraint Solving and Constraint Logic Programming, Lausanne, pp. 244-257, 2004.
  • Kovács, A.; Márkus, A.; Váncza, J.: Structural Exploration of Constraint-based Scheduling Problems. In: Proceedings of the 37th CIRP International Seminar on Manufacturing Systems, Budapest, pp. 433-439, 2004.
  • Kovács, A.: A Novel Approach to Aggregate Scheduling in Project-Oriented Manufacturing. In: Proceedings of the 13th International Conference on Automated Planning and Scheduling, Doctoral Consortium, Trento, pp. 63-67, 2003.
  • Kovács, A.; Váncza, J.; Monostori, L.; Kádár, B.; Pfeiffer, A.: Real-life Scheduling Using Constraint Programming and Simulation. In: Intelligent Manufacturing Systems 2003 – Proceedings of the 7th IFAC Workshop on Intelligent Manufacturing Systems, Budapest, pp. 213-218, Elsevier, 2003.
  • Kovács, A.; Váncza, J.: Constraint Feedback in Solving Incomplete Models: A Case Study in Sheet Metal Bending. In: STAIRS 2002 – Starting Artificial Researchers Symposium, Lyon, pp. 109-118, (Frontiers in Artificial Intelligence and Applications Vol. 78, IOS) 2002.
  • Deák, F.; Kovács, A.; Váncza, J.; Dobrowiecki, T.: Hierarchical Knowledge-based Process Planning in Manufacturing. In: Digital Enterprise Challenges – Proceedings of the 11th International Conference on Programming Languages for Manufacturing, Budapest, pp. 428-439, (IFIP Conference Series Vol. 77, Kluwer) 2001. [pdf]

Misc

  • Zahorán, L.; Kovács, A.: ProSeqqo: A generic solver for process planning and sequencing in industrial robotics. 33rd International Conference on Automated Planning and Scheduling (ICAPS 2023), Prague, Czech Republic, Journal track presentation, 2023. [pdf] [doi]
  • Kovács, A.: Kétszintű optimalizálás intelligens energiahálózatokban (plenáris előadás). XXXV. Magyar Operációkutatás Konferencia, Budapest, pp. 7, 2023.
  • Kis, T.; Kovács, A.; Mészáros, Cs.: Robust bilevel programming with uncertain follower objectives. Middle-European Conference on Applied Theoretical Computer Science (MATCOS-22), Koper, Slovenia, pp.13, 2022.
  • Bergmann, J.; Váncza, J.; Kovács, A.: Automated vehicle fleet management in relentless production – a case study in semi-conductor manufacturing. In: Book of Abstracts of the EURO 2022 Conference, Espooo, Finland, pp. 279, 2022. [link]
  • Horváth, G.; Kardos, Cs.; Kovács, A.; Pataki, B.E.; Tóth, S.: Worker assistance suite for efficient human-robot collaboration. In: Wang, L.; Wang, X.V.; Váncza, J.; Kemény, Zs. (eds): Advanced human-robot collaboration in manufacturing, pp. 375-394, Springer, 2021. [doi-book] [doi-chapter]
  • Zahorán, L.; Kovács, A.: Efficient collision detection for path planning for industrial robots. In: Proc. of the 6th Student Computer Science Research Conference (StuCoSReC 2019), Koper, Slovenia, pp. 19-22, 2019.
  • Kovács, A.: Fogyasztói modellek identifikációja energiahálózatok keresletoldali szabályozásához. XXXIII. Magyar Operációkutatás Konferencia, Szeged, pp. 77, 2019.
  • Horváth, M.; Fekula, M.; Kis, T.; Kovács, A.: Diszjunktív programozás alapú eljárás összeszerelés tervezéshez. XXXIII. Magyar Operációkutatás Konferencia, Szeged, pp. 67, 2019.
  • Kovács, A.: Kétszintű programozási megközelítés áramtarifa optimalizálására a keresletoldali szabályozáshoz. In: Book of Abstracts, XXXII. Magyar Operációkutatás Konferencia, Cegléd, pp. 28, 2017.
  • Kovács, A.; Csáji, B.Cs.; Váncza, J.: Energy management and optimization in intelligent public lighting. In: Book of Abstracts of the BJMT Conference on Applied Mathematics, Győr, pp. 14, 2016.
  • Prikler, L.; Dudás, P.; Bátai, R.; Kovács, A.: Az E+grid rendszer hosszútávú kísérleti eredményeinek bemutatása. Magyar Elektrotechnikai Egyesület (MEE) 63. Vándorgyũlés, Szeged, 2016.
  • Franciosa, P.; Das, A.; Yilmazer, S.; Ceglarek, D.; Erdős, G.; Kovács, A.; Váncza, J.; Marine, C.; Bolognese, L.; Mistry, A.: Design synthesis of robotic remote laser welding assembly system with compliant non-ideal parts. International Computer Aided Engineering (CAE) Conference, 27-28 October, 2014, Pacengo del Garda (Verona), Italy, p. 3, 2014. [link]
  • Prikler, L.; Dán, A.; Dudás, P.; Bátai, R.; Balázs, L., Kovács, A.: Pozitív energiamérlegű intelligens közvilágítás energetikai rendszerének bemutatása. Magyar Elektrotechnikai Egyesület (MEE) 61. Vándorgyűlés, 2014.
  • Bátai, R.; Balázs, L.; Révész, T.; Pedone, G.; Kovács, A.; Prikler, L.: E+GRID: Energy-positive adaptive street lighting. In: Proc. of the 14th International Symposium on the Science and Technology of Lighting (LS14), Como, Itay, pp. 145-148, 2014.
  • Erdős, G.; Kovács, A.; Váncza, J.: RLW workstation OLP planner. In: Proc. of the 2014 Korea-EU Connected Smart Factory Symposium, pp. 29-42, 2014.
  • Erdős, G.; Kovács, A.; Váncza, J.: RLW workstation OLP planner. In: International symposium on remote laser welding, Ulsan, Korea, pp. 19-32, 2014.
  • Buzga, V.; Kovács, A.: Path Planning for Remote Laser Welding Operations Using Collision Maps. In: Abstracts of Factory Automation 2013, Veszprém, pp.10, 2013.
  • Kovács, A.; Erdős, G.; Viharos, Zs.J.; Monostori, L.: Failure detection and maintenance scheduling for wind farms (Szélparkok hibadetektálása és karbantartás ütemezése). In: Book of Abstracts of the BJMT Conference on Applied Mathematics, Győr, pp. 13, 2012.
  • Viharos, Zs. J.; Erdős, Gábor.; Kovács, A.; Monostori, L.: Artificial intelligence applications for maintenance oriented health monitoring of wind turbines. In: Gépészet 2010, Proceedings of the 7th conference on mechanical engineering, pp. 403-413, 2010.
  • Kovács, A.; Egri, P.; Váncza, J.: Integrált termeléstervezés és ütemezés megrendelésre történő gyártásban (Integrated production planning and scheduling in make-to-order manufacturing. In Hungarian). Gépgyártás 45/1, pp. 45-47, 2005. [pdf]
  • Egri, P.; Kovács, A.; Márkus, A.; Váncza, J.: Project-Oriented Approach to Production Planning and Scheduling in Make-to-Order Manufacturing. Production Systems and Information Engineering 2, pp.23-36, 2005. [pdf]
  • Kovács, A.: A Novel Approach to Aggregate Scheduling in Project-Oriented Manufacturing. Projects & Profits, October 2004, pp. 73-80.
  • Erdélyi, F.; Tóth, T.; Somló, J.; Kovács, A.; Kádár, B.; Márkus, A.; Váncza, J.: Production management: Taking up the challenge of integration. In: Gépészet 2002, Proceedings of the 3rd Conference on Mechanical Engineering, pp. 156-165, 2002.

Theses

Important publications

All publications