Botond Kádár
Ph.D.
-
Address
1111 Budapest, Kende u. 13-17.
Room number
K 012
Email
kadar.botond@sztaki.hun-ren.hu
Phone
+36 1 279 6217
Fax
+36 1 466 7503
Personal
Born: September 23, 1969, Kolozsvár
Marital status: married, 4 children
Education
- PhD degree in Mechanical Engineering, BME, Faculty of Mechanical Engineering, 2002
- Business Economics, Budapest University of Economic Sciences, 1997
- MSc. Degree in Mechanical Engineering, Manufacturing Technology, Technical University of Budapest, 1993
Fields of interest
- Production planning and scheduling, management of complexity, changes and disturbances in complex production structures, intelligent manufacturing processes and systems, distributed production systems, digital factories, virtual enterprises, modelling, simulation and optimisation of production systems, application of Artificial Intelligence (AI) in manufacturing
Current position, employment record
- Senior Researcher at Computer and Automation Institute, Hungarian Academy of Sciences, since 2002
- Researcher at Computer and Automation Institute, Hungarian Academy of Sciences, 1998-2002
- Research Associate at Computer and Automation Institute, Hungarian Academy of Sciences, 1994-1998
- PhD Student, Junior Research Fellow, 1994-1997
- IT Specialist. Technical University of Budapest, 1993-1994
Awards
- Recipient of the Bolyai János scholarship, 2003-2006
- Recipient of Hungarian Academy of Sciences Award for Best Junior Scientists, 2003
- Recipient of the Bolyai János scholarship, 1999-2002
- Recipient of the PhD Candidate Award 1st place, 1997
- Recipient of the SZTAKI Award for Best Junior Scientists, 1995 and 1997
Recent industrial and research projects
- 2008-2009 HITACHI production control modeling project, project manager
- 2008 Robert Bosch Hungary, Quality Management and Logistics projects, project manager.
- 2008 AUDI Motor Hungary, Simulation project, project manager.
- 2007 Robert Bosch Hungary, Logistics project, project manager.
- 2006-2009 DiFac (Digital Factory for for Human-Oriented Production System), Sixth Framework Project of the EU, Hungarian project manager.
- 2005-2007 Collplexity (Collaborative Complexity, Collaborations as Complex Systems), Sixth Framework Project of the EU, participant and co-manager of SZTAKI.
- 2005-2007 Valósidejű válallatok, NKFP 2., Cluster manager.
- 2005-2007 Elosztott, moduláris termelési struktúrák modellezése, tervezése és irányítása, OTKA, participant
- 2001-2004 MPA (Modular Plant Architecture), Fifth Framework Project of the EU, GRD3-2001-60064, Hungarian project manager.
- 2000-2003 Digitális vállalatok, termelési hálózatok, NKFP.
- 2000-2002 VIMIMS (Virtual Institute for the Modelling of Industrial Manufacturing Systems), CP-1-2000-1-IT-MINERVA-ODL, Hungarian project manager.
Skills
- Participated and managed several IT software development and consultancy projects High experience in modelling and simulation of complex logistics and manufacturing systems Programming in high-level languages and web-based application development Consulting and project management experience for Hungarian companies
Language skills
- Mother tongue: Hungarian; intermediate: English, Romanian, lower grade: German
Publication activity
- Author or co-author of 87 publications, out of these 11 published in refereed journals. Publications mostly contributed to the distributed manufacturing architecture field. His known, independent citations are over 130, including about 100 from foreign authors. The number of presentation held on international conferences and seminars are over 20.
Important publications
★ Smart, simulation-based resource sharing in federated production networks
Publication date2018★ Supporting multi-level and robust production planning and execution
Publication date2015★ Robust production planning and capacity control for flexible assembly lines
Publication date2015★ Capacity management for assembly systems with dedicated and reconfigurable resources
Publication date2014★ Real-time, cooperative enterprises for customised mass production
Publication date2009★ Stability-oriented evaluation of rescheduling strategies, by using simulation
Publication date2007★ Solution approaches to real-time control of customized mass production
Publication date2007Financial aspects of a trust-based resource sharing platform
Publication date2023